GUTSCHEIN
Bitte haben Sie einen Moment Geduld, wir legen Ihr Produkt in den Warenkorb.
Bitte haben Sie einen Moment Geduld, wir legen Ihr Produkt in den Warenkorb.
| Themen | Kunst Architektur Berufliche Praxis |
|---|---|
| ISBN | 9781934579404 |
| Sprache | Englisch |
| Erscheinungsdatum | 23.09.2006 |
| Größe | 216 x 140 mm |
| Verlag | PRAIZION MEDIA |
| Lieferzeit | Lieferung in 7-14 Werktagen |
| Herstellerangaben | Anzeigen Libri GmbH Europaallee 1 | D-36244 Bad Hersfeld gpsr@libri.de |
This is a Textual and Audio visual step by step explanation and expansion of earned value piece by piece. At the end of the book and tutorial, you will come away with enough information to lead you on your path to being an EV expert. These are the foundations you need to move to the next level. Good for Project Managers without a clue how to implement EV or introduce it to their team. Also good to reinforce PMPs knowledge on real world EV. Lots of examples! What is EV/EVM/EVMS? How do you calculate EV, SPI, CPI? What is the reason for using Earned Value metrics? What do you do after deducing these metrics?
| Themen | Kunst Architektur Berufliche Praxis |
|---|---|
| ISBN | 9781934579404 |
| Sprache | Englisch |
| Erscheinungsdatum | 23.09.2006 |
| Größe | 216 x 140 mm |
| Verlag | PRAIZION MEDIA |
| Lieferzeit | Lieferung in 7-14 Werktagen |
| Herstellerangaben | Anzeigen Libri GmbH Europaallee 1 | D-36244 Bad Hersfeld gpsr@libri.de |
Wie gefällt Ihnen unser Shop?