Intelligent production control for time-constrained complex job shops

217 Seiten, Taschenbuch
€ 59.8
-
+
Lieferung in 7-14 Werktagen

Bitte haben Sie einen Moment Geduld, wir legen Ihr Produkt in den Warenkorb.

Mehr Informationen
Reihe Forschungsberichte aus dem wbk, Institut für Produktionstechnik Universität Karlsruhe
ISBN 9783844094640
Sprache Englisch
Erscheinungsdatum 16.05.2024
Genre Technik/Maschinenbau, Fertigungstechnik
Verlag Shaker
LieferzeitLieferung in 7-14 Werktagen
Unsere Prinzipien
  • ✔ kostenlose Lieferung innerhalb Österreichs ab € 35,–
  • ✔ über 1,5 Mio. Bücher, DVDs & CDs im Angebot
  • ✔ alle FALTER-Produkte und Abos, nur hier!
  • ✔ hohe Sicherheit durch SSL-Verschlüsselung (RSA 4096 bit)
  • ✔ keine Weitergabe personenbezogener Daten an Dritte
  • ✔ als 100% österreichisches Unternehmen liefern wir innerhalb Österreichs mit der Österreichischen Post
Kurzbeschreibung des Verlags

In wake of an ever increasing complexity the desire to move towards intelligently controlling operations is amplified in manufacturing. Complex job shops mark the most complex production environments that require a high degree of agility to control. Among these complex manufacturing environments semiconductor manufacturing stands out as it combines all complexities to form a truly complex job shop. Hence, operational excellence is the key to success and relies on intelligent production control. A major concern in controlling such complex job shops, in this case semiconductor wafer fabrication, is the presence of time-constraints that limit the transition time of products between two, mostly successive, processes. Adhering to these product specific time-constraints is of utmost importance as violations result in scrapping the violating product. The state-of-the-art production control of these dispatching decisions that aim at adhering to time-constraints is based on error-prone manual control that is stressful for human operators. Thus, within this thesis a novel, real-time data based approach for intelligently controlling production control for time-constrained complex job shops is presented. Using an up-to-the-minute replica of the real system both uni-, multi-variate time series models and a digital twin are used to obtain violation predictions. As a second step, based on the time-constraint violation expectancy the production control is derived and implemented with a real-world semiconductor manufacturing plant real-time data. The resulting approach is, therefore, validated against the state-of-the-art showing significant improvements as many time-constraint violations could be prevented.

Mehr Informationen
Reihe Forschungsberichte aus dem wbk, Institut für Produktionstechnik Universität Karlsruhe
ISBN 9783844094640
Sprache Englisch
Erscheinungsdatum 16.05.2024
Genre Technik/Maschinenbau, Fertigungstechnik
Verlag Shaker
LieferzeitLieferung in 7-14 Werktagen
Unsere Prinzipien
  • ✔ kostenlose Lieferung innerhalb Österreichs ab € 35,–
  • ✔ über 1,5 Mio. Bücher, DVDs & CDs im Angebot
  • ✔ alle FALTER-Produkte und Abos, nur hier!
  • ✔ hohe Sicherheit durch SSL-Verschlüsselung (RSA 4096 bit)
  • ✔ keine Weitergabe personenbezogener Daten an Dritte
  • ✔ als 100% österreichisches Unternehmen liefern wir innerhalb Österreichs mit der Österreichischen Post